Linked Reactions Table for General Footings
How to view, edit, and delete column reactions linked to the active general footing calculation.
The Linked Reactions table displays all support reactions and their associated link settings that are linked to the active general footing calculation.

1) To Edit a Linked Load: Select the existing linked load from the table. The Edit Link Settings section will populate with the existing link settings. Modify the settings as desired and click the Update button. You can also use the Info button to edit the existing linked load as well.
2) To Delete a Linked Load: Select a linked load from the table and click the Unlink Load button.
Last updated
Was this helpful?

